A(n)_____ chart is a graphical network model that depicts a project's tasks and the relationships between those tasks.

Correct Answer

verifed

verified

What is a business requirement?


A) The nonspecific business requests the system must meet to be successful
B) The specific business requests the system must meet to be successful
C) The nonspecific methodology the system must meet to be successful
D) The specific methodology the system must meet to be successful

E) A) and C)
F) All of the above

Correct Answer

verifed

verified

____________ maintenance makes system changes to repair design flaws,coding errors,or implementation issues.

Correct Answer

verifed

verified

The traditional waterfall methodology is a sequential,activity-based process in which each phase in the SDLC is performed sequentially from planning through implementation and maintenance.

A) True
B) False

Correct Answer

verifed

verified

Workshop training is held in a classroom environment and led by an instructor.

A) True
B) False

Correct Answer

verifed

verified

______________ reporting is an internal report that highlights situations occurring outside of the normal operating range for a condition or standard.

Correct Answer

verifed

verified

Project ____________ represent key dates when a certain group of activities must be performed.

Correct Answer

verifed

verified

What are specific factors that can limit options including budget,delivery dates,available skilled resources,and organizational policies?


A) Project objectives
B) Project constraints
C) Project assumptions
D) Project deliverable

E) B) and C)
F) A) and D)

Correct Answer

verifed

verified

Explain the business benefits associated with successful software development.

Correct Answer

verifed

verified

Software development uses the systems de...

View Answer

A(n)____________ is a temporary endeavor undertaken to create a unique product,service,or result.

Correct Answer

verifed

verified

Time,cost,and ___________ are the three primary variables in any project.

Correct Answer

verifed

verified

The project requirements document defines the specifications for product/output of the project and is key for managing expectations,controlling scope,and completing other planning efforts.

A) True
B) False

Correct Answer

verifed

verified

What do software engineers use as tools to provide automated support for the development of the system?


A) Software
B) IEEE
C) COBIT
D) CASE

E) A) and B)
F) B) and D)

Correct Answer

verifed

verified

D

Which phase of the SDLC gathers business requirements?


A) Plan
B) Analysis
C) Test
D) Design

E) A) and C)
F) A) and D)

Correct Answer

verifed

verified

B

Rational _________ process (RUP)methodology,owned by IBM,provides a framework for breaking down the development of software into four "gates."

Correct Answer

verifed

verified

A project _____________ is any measurable,tangible,verifiable outcome,result,or item that is produced to complete a project or part of a project.

Correct Answer

verifed

verified

_____________ is a technique for generating ideas by encouraging participants to offer as many ideas as possible in a short period without any analysis until all the ideas have been exhausted.

Correct Answer

verifed

verified

Which phase does the firm analyzes its end-user business requirements and refines project goals into defined functions and operations of the intended system?


A) Analysis phase
B) Design phase
C) Development phase
D) Testing phase

E) A) and B)
F) C) and D)

Correct Answer

verifed

verified

What is a set of best practices that helps an organization to maximize the benefits of an information system,while at the same time establishing appropriate controls to ensure minimum errors?


A) COBIT
B) CASE
C) IEEE
D) All of the above

E) All of the above
F) C) and D)

Correct Answer

verifed

verified

__________________ testing verifies that separate systems can work together passing data back and forth correctly.

Correct Answer

verifed

verified

Integration