Capacity requirements planning is an important feature in MRP.

A) True
B) False

Correct Answer

verifed

verified

Successful implementation of an effective MRP system depends upon: (1) the recognition of the difference between independent and dependent demand, and (2) :


A) computers.
B) development of the EOQ model.
C) inventory control systems.
D) blanket purchase orders.
E) the Internet.

F) All of the above
G) B) and C)

Correct Answer

verifed

verified

When MRP II systems include feedback to revise a plan that is not feasible, they are known as:


A) MRP III.
B) enterprise resource planning.
C) circular MRP.
D) feasible MRP.
E) closed loop MRP.

F) B) and E)
G) C) and E)

Correct Answer

verifed

verified

The master production schedule states which end items are to be produced, in addition to when and how many.

A) True
B) False

Correct Answer

verifed

verified

Refer to this product tree: Refer to this product tree:   If 40 Ps are needed, and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies, how many Cs are needed? A)  340 B)  350 C)  380 D)  400 E)  590 If 40 Ps are needed, and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies, how many Cs are needed?


A) 340
B) 350
C) 380
D) 400
E) 590

F) A) and B)
G) B) and E)

Correct Answer

verifed

verified

Low-level coding represents items less than $18 per unit.

A) True
B) False

Correct Answer

verifed

verified

Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot) , and quantities on hand:  Deluxe Easter Basket BOM  Lead Time  On-Hand  Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per)  2 weeks 30 Carved Chocolate Eggs (4 per)  1 week 50\begin{array} { l c c } \text { Deluxe Easter Basket BOM } & \text { Lead Time } & \text { On-Hand } \\\text { Deluxe Easter Basket } & 1 \text { week } & 10 \\\text { Dark Chocolate Truffles (2 per) } & 2 \text { weeks } & 30 \\\text { Carved Chocolate Eggs (4 per) } & 1 \text { week } & 50\end{array} Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs. If the firm is using a fixed-period lot size of two periods, what is the order size for the first order?


A) 120
B) 200
C) 280
D) 160
E) 150

F) A) and E)
G) B) and C)

Correct Answer

verifed

verified

In MRP, scheduled receipts are:


A) identical to planned-order receipts.
B) identical to planned-order releases.
C) open orders (that is, ordered before the first time bucket, but not delivered yet) .
D) net requirements.
E) available-to-promise inventory.

F) A) and C)
G) A) and B)

Correct Answer

verifed

verified

The bill of materials indicates how much material will be needed to produce the quantities on a given master production schedule.

A) True
B) False

Correct Answer

verifed

verified

In MRP, under lot-for-lot ordering, planned-order receipts are:


A) identical to scheduled receipts.
B) identical to net requirements.
C) open orders (that is, ordered before the first time bucket, but not delivered yet) .
D) gross requirements.
E) available-to-promise inventory.

F) A) and D)
G) D) and E)

Correct Answer

verifed

verified

ERP began in manufacturing organizations but has spread into service organizations.

A) True
B) False

Correct Answer

verifed

verified

In many organizations, information flows much more freely within functions than it does across functions. __________ represents an expanded effort to overcome this tendency.


A) MRP
B) ERP
C) CRP
D) MRPII
E) DRP

F) B) and D)
G) B) and E)

Correct Answer

verifed

verified

Which of the following is not usually necessary in order to have an effective MRP system?


A) a computer and software
B) an accurate bill of materials
C) lot-for-lot ordering
D) an up-to-date master schedule
E) integrity of file data

F) A) and D)
G) A) and C)

Correct Answer

verifed

verified

Which is true of a net-change system?


A) It is a batch-type system which is updated periodically.
B) It is usually run at the beginning of each month.
C) The production plan is modified to reflect changes as they occur
D) It is used to authorize the execution of planned orders.
E) It indicates the amount and timing of future changes.

F) A) and C)
G) A) and B)

Correct Answer

verifed

verified

Bunny Helpers, Inc., has just received an order for 100 Deluxe Easter Baskets, which must be ready for delivery at the start of week 6. An MRP planner has prepared the following table showing product structure, lead times (orders are lot-for-lot) , and quantities on hand:  Deluxe Easter Basket BOM  Lead Time  On-Hand  Deluxe Easter Basket 1 week 10 Dark Chocolate Truffles (2 per)  2 weeks 30 Carved Chocolate Eggs (4 per)  1 week 50\begin{array} { l c c } \text { Deluxe Easter Basket BOM } & \text { Lead Time } & \text { On-Hand } \\\text { Deluxe Easter Basket } & 1 \text { week } & 10 \\\text { Dark Chocolate Truffles (2 per) } & 2 \text { weeks } & 30 \\\text { Carved Chocolate Eggs (4 per) } & 1 \text { week } & 50\end{array} Each Deluxe Basket contains two dark chocolate truffles and four carved chocolate eggs. How many dark chocolate eggs should be ordered?


A) 310
B) 450
C) 500
D) 550
E) 600

F) D) and E)
G) A) and D)

Correct Answer

verifed

verified

A bill of materials contains a listing of all the assemblies, parts, and materials needed to produce one unit of an end item.

A) True
B) False

Correct Answer

verifed

verified

Initially, the output from MRP may not represent a feasible schedule.

A) True
B) False

Correct Answer

verifed

verified

The MRP input storing information on the status of each item by time period (e.g., scheduled receipts, lead time, lot size) is the:


A) master production schedule.
B) bill of materials.
C) inventory records.
D) assembly time chart.
E) net requirements chart.

F) D) and E)
G) B) and C)

Correct Answer

verifed

verified

Independent demand tends to be more "lumpy" than dependent demand, meaning that we need large quantities followed by periods of no demand.

A) True
B) False

Correct Answer

verifed

verified

MRP, considering inventory position, bills of material, open purchase orders, and lead times guarantees a feasible production plan if the inputs to MRP are accurate.

A) True
B) False

Correct Answer

verifed

verified

Showing 41 - 60 of 81